Recent Updates
Evaluation Committee Review
The committee is currently reviewing the submitted proposals, with the review process scheduled to conclude by February 20, 2025.
Key Expertise
Architects
Structural Engineers
Architects, Structural Engineers
Sustainable Architecture, Urban Planning
Scope of Work, Tasks, and Project Deliverables
The RFP should include the following work tasks:
- Review existing master plan for Zone-I.
- Prepare an integrated master plan for Zone-II.
- Design street network and infrastructure layout.
- Develop building typology strategies.
- Prepare plans for energy-efficient buildings.
Proposal Submittal
Interested consultants must submit a digital copy of the proposal to the Project Manager as follows:
- Submit electronic proposals through the THSTI procurement portal.
Proposal Requirement
Proposals shall be limited to 70 one-sided pages (8.5 inches x 11 inches). All proposals should be focused on the defined content. Proposals shall be provided in PDF format.
Proposals to the RFP should include the following sections:
- Master plan concept
- Project timeline
- Team experience
- Cost breakdown